• 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant
  • 25hl brewery equipment / beer brewing equipment / beer plant

25hl brewery equipment / beer brewing equipment / beer plant

Model No.︰

RM2500L

Brand Name︰

RAINBOW

Country of Origin︰

China

Unit Price︰

US $ 75000 / pc

Minimum Order︰

1 pc

Share on:

Product Description

Product Overviews

If you want a complete brewery, some questions need to be confirmed:

1-We have capacities from 100 liter to 10000 liter, what capacity do you prefer, 25hl per batch?

2-What kind of heating source do you like, steam, gas direct fire or electric?

3-Do you need other equipment, such as steam boiler, bottle filling and capping machine, keg filling and cleaning machine, kegs...?

4-What is the electricity voltage in your place?

Here follows is the parameter of our 2500L brewery, please check the chart. 

Items

Equipment

Specification

Quantity

Malt miller

Malt miller

500kg/hour

1

Brewhouse system

Mash tun&lauter tun

2500L

1

Brew kettle&whirlpool tank

2500L

1

Hot liquid tank

2500L

1

Wort oxygenator

 

1

Plate heat exchanger

25m2

1

Pump

5t/h

2

Working platform

 

1

Fermentation system

Fermenter

2500L

6

Yeast adding tank

100L

1

Cooling system

Glycol water tank

4000L

1

Cooling compressor

10hp

2

Pump

5t/h

1

CIP washing system

Alkali tank

300L

1

Sterilization tank

300L

1

Pump

5t/h

1

Control system

Simens PLC control box

 

1

Spare parts

 All spare parts

 

Propsoal1

 Spare Parts 

Our Spare Parts

Pipe line for brewhouse

SUS304

Measuring cylinder

SUS304

Butterfly valve

Ø32

Butterfly valve

Ø38

Sight glass

Ø32

Saccharimeter

0-10; 10-20

Spent grains harrow

SUS 304

Steam solenoid valve

Ø32

Fermenter’s safety valve

ø32

Fermenter’s Sample valve

ø32

Pressure gauge

0-0.6Mpa

Pipe line for cooling unit

SUS 304

Cooling water solenoid valve

ø32

Cooling pipe insulation

 

Expansion valve for cooling compressor

 

Control box cable

 

Signal wire

 

SIEMENS frequency convertor

V20

Electric relay

Omron

Temperature sensor

PT100

 Clients' Country

Germany, Czech Republic, USA, Canada, Russia, Sweden, Paraguay, Singapore, Australia, Finland...

 

Company Information

We, Jinan MIBE Machinery Co.,Ltd & Jinan Rainbow Machinery are a professional manufacturing and trading company for good quality Beer Brewing Systems, ranging from 100 liter to 10000 liter per batch, which is used for home, Bar/Pub, Restaurant, Hotel and Small Beer Factory.

  • Brewhouse System
  • Fermentation System
  • Cooling System
  • CIP System
  • Control System
  • Filtration System (need or not?)
  • Bottle Machines (need or not?)
  • Keg Machines (need or not?)
  • Beer Tower (need or not?)
  • Kegs (need or not?)
  • Steam Boiler (need or not?) 

Product Effects

 1-Brew all kinds of beer: pale beer, brown beer, stout beer....

2-Customize:   a. capacity(100L, 200L, 300L, 500L, 1000L, 10BBL, 2000L, 3000L...)

                       b. voltage(220v or 380v or other electricity voltage )

                       c. material(stainless steel, red copper)

                       d. dimension(length, height, width)

                       e. heating source(electric, steam, direct gas fire heating)

                       f. control system(digital display controlling system, Simens PLC control system)
 

3-Water and Pressure Test is made before shipment.

 Our Services

 1. We can provide services such as product design( we recommend suitable equipment as per your budget), beer tank layout, installation and training of beer fermentation... 

2. bottle filling and washing machine, keg filling and washing machine, label machine, keg and steam boiler as per your capacity

3. 36 months for the main tank

Images

EQUIPMENT IMAGES

6

2000 8000HTB1ufXzJFXXXXX1XXXXq6xXFXXXyIMG_6805

IMG_5314cooling, boiler..._brewery

POLISHING AND WELDING

polishing and welding

PACKAGE IMAGE

IMG_6849IMG_4984

FACTORY IMAGES

factoryCERTIFICATE

CERTIFICATE

CONTACT INFORMATION

Contact Information



Payment Terms︰ T/T, L/C, Western Union

Product Image